ELTAŞ A.Ş. High Voltage Test Laboratory is subjected to perform routine, type & special tests on transformers up to 250 MVA 420 kV, according to IEC, IEEE, ANSI standards, domestic & foreign customer specifications.

Our laboratories were accredited under the TS EN ISO 17025: 2005 standard in 2010 and received the title of the independent laboratory. In 2019, the scope of accreditation switched to the revision of the TS EN ISO 17025: 2017 Standard.

Test laboratory has an area of 1000 m2, active test area is 600 m2.

Transportation of transformers were done by air cushion to the test room. The test room has been designed as a faraday cage for Determination of Sound Level & Measurement of Partial Discharge to provide the background noise level as low as possible.

There is an overhead crane with 3 hoists inside of the test room for mounting auxiliary equipment.

Grounding resistance of test field is lower than 0,5 Ω.

Some major test equipments of test laboratory are;

  • HAEFELY TMS580 transformer measuring system
  • HAEFELY PD detector
  • Dr. Strauss digital recorder
  • 2500 kVA voltage regulating transformer
  • 87 MVAr variable capacitor bank
  • 350 kV, 1050 kVA 3A AC series resonant system
  • 2400 kV, 240 kJ 12 stages lightning impulse generator
  • 1 MW, 2 MVA 0-150 Hz, 0-400 V output frequency converter system

Test List of High Voltage Test laboratory

  1. Measurement Of Winding Resistances (IEC 60076-1 Clause 11.2)
  2. Measurement Of Voltage Ratio & Check Of Phase Displacement (IEC 60076-1 Clause 11.3)
  3. Measurement Of Short-Circuit Impedance And Load Loss (IEC 60076-1 Clause 11.4)
  4. Measurement Of No-Load Loss And Current (IEC 60076-1 Clause 11.5)
  5. Tests On On-Load Tap-Changers - Operation Test (IEC 60076-1 Clause 11.7)
  6. Leak Testing With Pressure For Liquid Immersed Transformers (Tightness Test) (IEC 60076-1 Clause 11.8)
  7. Gas-Filled Power Transformers Tightness Tests & Pressure Tests For Tanks (IEC 60076-15)
  8. Check Of The Ratio And Polarity Of Built-In Current Transformers. (IEC 60076-1 Clause 11.1.2.1)
  9. Check Of Core And Frame Insulation For Liquid Immersed Transformers With Core Or Frame Insulation (IEC 60076-1 Clause 11.12)
  10. Determination Of Capacitances Windings-To-Earth And Between Windings. (IEC 60076-1 Clause 11.1.2.2)
  11. Measurement Of D.C. Insulation Resistance Between Each Winding To Earth And Between Windings. (IEC 60076-1 Clause 11.1.2.2)
  12. Measurement Of Dissipation Factor (tan δ) Of The Insulation System Capacitances. (IEC 60076-1 Clause 11.1.2.2)
  13. Measurement Of No-Load Loss And Current At 90 % And 110 % Of Rated Voltage (IEC 60076-1 Clause 11.5)
  14. Temperature-Rise Type Test (IEC 60076-2)
  15. Determination Of Sound Level For Each Method Of Cooling For Which A Guaranteed Sound Level Is Specified. (IEC 60076-10)
  16. Measurement Of The Power Taken By The Fan And Liquid Pump Motors. (IEC 60076-1 Clause 11.1.3)
  17. Determination Of Transient Voltage Transfer Characteristics (Annex B Of IEC 60076-3:2000).
  18. Measurement Of Zero-Sequence İmpedance(S) On Three-Phase Transformers (IEC 60076-1 Clause 11.6)
  19. Vacuum Deflection Test On Liquid İmmersed Transformers (IEC 60076-1 Clause 11.9)
  20. Pressure Deflection Test On Liquid İmmersed Transformers (IEC 60076-1 Clause 11.10)
  21. Measurement Of Frequency Response (Frequency Response Analysis Or FRA). The Test Procedure Shall Be Agreed Between Manufacturer And Purchaser.
  22. Paints And Varnishes – Cross-Cut Test (ISO 2409:2007)
  23. Measurement thickness of paint
  24. Check Of Core And Frame Insulation For Liquid İmmersed Transformers With Core Or Frame Insulation (IEC 60076-1 Clause 11.12)
  25. Insulation Of Auxiliary Wiring (Auxw) (IEC 60076-3 Clause 9)
  26. Applied Voltage Test (AV) (IEC 60076-3 Clause 10)
  27. Induced Voltage Withstand Test (IVW) (IEC 60076-3 Clause 11.2)
  28. Induced Voltage Test With Partial Discharge Measurement (IVPD) IEC 60076-3 Clause 11.3)
  29. Line Terminal AC Withstand Test (LTAC) (IEC 60076-3 Clause 12)
  30. Full Wave Lightning İmpulse Test (LI) (IEC 60076-3 Clause 13.2)
  31. Chopped Wave Lightning İmpulse Test (LIC) (IEC 60076-3 Clause 13.3)
  32. Lightning Impulse Test On A Neutral Terminal (LIN) (IEC 60076-3 Clause 13.4)
  33. Switching Impulse Test (SI) (IEC 60076-3 Clause 14)
  34. Radio Interference Voltage (RIV) Test
  35. DIRANA (Dielectric Response Analysis – Determination Of Water Content In Insulation Material) Test
  36. Measurement Of Excitation Current
  37. Measurement Of The Harmonics Of The No-Load Current